The stone processing center is a precision CNC equipment. Necessary routine maintenance and upkeep are critical to the longevity and accuracy of your machine. Therefore, please follow the following requirements for care and maintenance.
 
1. The continuous operation time should not exceed 10 hours a day to ensure the cleanliness of the cooling water and the normal operation of the water pump. Never cause the water spindle motor to be short of water. Change the cooling water regularly to prevent the water temperature from being too high. If the working environment temperature is too low in winter, the water in the water tank can be replaced with antifreeze.
 
2. After each use of the stone machine, pay attention to cleaning, be sure to clean the dust on the platform and transmission system, and lubricate the transmission system (X, Y, Z axis) regularly (weekly).
 
(Note: The three-axis polished rods of X, Y, and Z should be maintained with engine oil; the screw rod part should be filled with high-speed butter; the working environment temperature is too low in winter, and the screw rod and polished rod (square guide rail or round guide rail) parts should be rinsed with kerosene first, and then Add engine oil, otherwise it will cause excessive resistance in the transmission part of the machine, causing the machine to deviate.)

 
3. When performing maintenance and inspection on electrical appliances, be sure to cut off the power supply and wait until there is no display on the monitor and the main circuit power indicator light goes out before proceeding.